$1.05M storm water drainage pre-engineering contract with HDR
Appropriates $1,050,000 from the Dedicated Drainage and Street Renewal Capital Fund and approves an engineering contract for storm water drainage planning. (Placed on the consent agenda.)
$1.05M · Vendor: HDR ENGINEERING, INC