Accepts $2,547,000 State Infrastructure Bank loan for Buffalo Soldier project
Accepts SIB loan S2026-015-11 for $2,547,000 to fund the local match and costs of the Buffalo Soldier Reconstruction and Brown Street Shared Use Path, repayable over no more than 25 years. Authorizes the City Manager to execute loan documents.
$2.55M · Vendor: State Infrastructure Bank · Vote 8-0