Seasonal guide
Cypress-Fairbanks ISD Bond Guide
Every school bond fact sheet from the past year, by district, with the dollar figures exactly as the sources stated them. Every figure links to the fact sheet that cites it.
On the Nov. 3, 2026 ballot
| District | What it pays for | Amount, as stated | Tax effect, as stated |
|---|---|---|---|
| Cy-Fair ISDProposition A (tax-rate election) | Teacher and staff pay, class sizes, campus safety staff, instructional materials, programs and bus transportation | Operations rate up 12 cents, from $0.6669 to $0.7869; the ballot states an additional $102,350,532 in operations revenue | All of Propositions A through E together: net +$0.09 per $100. A $350,000 home with $140,000 net taxable value pays $126 more a year. [1] |
| Cy-Fair ISDProposition B (bond) | Roofs, HVAC, fire alarms, generators, technology and cybersecurity, police radios and vehicles, buses, playgrounds, auditoriums | $1,299,520,000 | The district says the debt rate for Propositions B through E would drop 3 cents, from $0.40 to $0.37. [2] |
| Cy-Fair ISDProposition C (bond) | Instructional technology: Chromebooks, teacher laptops, displays, labs | $256,075,000 | Included in the Propositions B through E figure above. [2] |
| Cy-Fair ISDProposition D (bond) | Existing high school stadiums: turf, scoreboards, tracks | $60,800,000 | Included in the Propositions B through E figure above. [2] |
| Cy-Fair ISDProposition E (bond) | Existing pools: replastering and equipment | $20,125,000 | Included in the Propositions B through E figure above. [2] |
Upcoming bond elections
- Nov 3, 2026Cypress-Fairbanks ISD · Four-proposition $1.63 billion bond referendum for existing campus and facility updates · source8 days
Dates as stated in the news, each linked to its fact sheet. Confirm on your district's website or with the Harris County Clerk's elections office (harrisvotes.com).
Cy-Fair ISD 1 bond fact sheet
Figures stated in these fact sheets
| What | Figure, as stated | From |
|---|---|---|
| bond referendum for existing campus and facility updates | $1.63 billion | Oct 23, 2026 fact sheet |
| feasibility study for indoor recreation facility from Burditt Consultants, LLCWho pays: The Woodlands Township parks needs assessment reserve | $231,600 | Oct 23, 2026 fact sheet |
Fact sheets, newest first
- Cy-Fair ISD places $1.63 billion bond on November 2026 ballotOct 23, 2026 · $1.63 billion
Sources
Checked against these sources on October 19, 2026.